Hydro Kleen Contact Form
*To (contact):  *e-mail:
*Company & Refinery:
Furnace:
Job Description:
Job Commencement Date:

1. Process in this furnace:
2. Date of Last Decoke:
3. Last Method of Decoke:
4. % of Refinery Satisfaction with Last Decoke:
5. Normal Inlet & Outlet Temperatures:
6. Tube Metallurgy:
7. Recent Infra Red Scan or X-Ray Available:   Yes No 

8. Heater Tube Information:
 
Clean I.D. (S):
Avg. Tube Length:
Tubes per Pass:
# of Passes/Coils:
9. Sizes of access flanges
Rating and Diameter PPS/HKS Require 300#rf to 10" - 150#fr Above 10":
10. Is effluent Disposal a concern?   Yes No 
11. Is Water Supply a concern:   Yes No 
12. What is the bend design - U-bends, or headers:  
13. Estimate of deposit build-up and hardness:
14. What type & pressure of water is available:
15. Any other comments
the refinery believes relevant:
16. Special Operating
conditions (if any):
 

*Required Fields